Sewer Nodes (2)
| MAINTENANCE HOLE |
| ACCESS MH |
| DROP MH |
| CLEANOUT |
| DIVERSION |
| SEDIMENTATION MH |
| DISCHARGE POINT |
| STORAGE |
| VALVE |
| PUMP STATION |
| TREATMENT PLANT |
| NO ACCCESS POINT |
Sewer Pipes (3)
| SANITARY GRAVITY MAIN |
| SANITARY PRESSURE MAIN |
| COMBINED GRAVITY MAIN |
| COMBINED PRESSURE MAIN |
| COMBINED SEWER OVERFLOW MAIN |
| COMBIINED SEWER OVERFLOW |
| TREATMENT PLANT OUTFALL PIPE |
| NO FLOW PIPES |
| ABANDONED MAIN |
Storm Nodes (6)
| MAINTENANCE HOLE |
| DIVERSIONS |
| DROP MH |
| CLEANOUT |
| CHECK DAM |
| SEDIMENTATION MH |
| SUMP |
| DISCHARGE POINT |
| STORAGE |
| VALVE |
| TRASH RACK |
| WATERWAY FEATURE |
| PUMP STATIOON |
| NO ACCESS POINT |
Storm Pipes (7)
| STORM GRAVITY MAIN |
| STORM PRESSURE MAIN |
| EMERGENCY BYPASS |
| CULVERT |
| FRENCH DRAIN |
| DEWATERING TUNNEL |
| ABANDONED MAIN |
Surface Water (9)
| DITCH |
| NATURAL CHANNNEL |
| GREEN STREET FACILITY |
| SWALE |
| PRF |
| TRANSITION CHANNNEL |
| ROADSIDE TREATMENT FACILITY |
Lateral Reference Points (11)
Laterals (15)
| SEWER LATERAL |
| STORM LATERAL |
| ABANDONED LATERAL |
Connections (16)
Lateral Cleanouts (34)
Reference Points (17)
Inlet (19)
Inlet Leads (20)
| INLET LEAD |
| ABANDONED INLET LEAD |
Diversions (21)
Job Numbers (23)
Ponds Connectors (24)
Vaults / Ponds / Encasement Outlines (25)
| POND |
| ENCASEMENT |
| SPECIAL STRUCTURE |
Points (27)
| New / planned construction |
| Pending rehabilitation |
| Constructed, not in service |
| To Be Abandoned |
Lines (28)
| New / planned construction |
| Pending rehabilitation |
| Constructed, not in service |
| To Be Abandoned |
Non BES Ownership (33)
| Other Agencies |
| Private |
| Unknown Type |
|