Learn more about Bureau of Development Services permits. There are several types of permits reports available in the Building menu.
Sort, filter and search using any of the following:
PERMIT DETAILS | CASE NUMBER | ADDRESS | WORK PROPOSED | TYPE OF USE | DESCRIPTION OF WORK | VALUATION | DATE RECEIVED | DATE ISSUED | STATUS | IVR NUMBER | PROPERTY LEGAL DESCRIPTION | PERMIT INFO | CONTRACTOR | OWNER 1 | OWNER 2 | APPLICANT 1 | APPLICANT 2 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
https://www.portlandmaps.com/detail/permit/4967367_did/ | 23-082454-000-00-LU | 2307 SW NEBRASKA ST, 97239 | EN - Environmental Review | Type 2 procedure | Develop A Staggered 5 Unit Townhome Complex, Protecting The Environmental Protection Zone And Avoiding Removal Of Any Trees. | 0 | 09/08/2023 14:09 | Pending | 4967367 | 1S1E16CC 04800 BERTHA BLOCK 8 LOT 7 INC PT VAC ST LOT 8&9, LOT 10 | NEIL TUNMORE 1880 TWIN POINTS RD LAKE OSWEGO, OR 97034-3723 | NEIL TUNMORE PO BOX 2248 LAKE OSWEGO, OR 97035 | |||||
https://www.portlandmaps.com/detail/permit/4965352_did/ | 23-080512-000-00-EA | 4420 S SLAVIN RD, 97239 | PC - PreApplication Conference | A Pre-Application Conference To Discuss The Carolina Trunk Rehabilitation Project Which Will Replace A Large-Diameter Concrete Sewer Pipe Located In Southwest Portland That Runs From Southwest Barbur Boulevard Underneath Interstate 5 To South Macadam Avenue. The Goal Of The Project Is To Improve Sewer System Reliability And Allow For Future Stormwater And Sanitary Sewer Separation. | 0 | 09/05/2023 12:29 | Pending - EA | 4965352 | 1S1E15BB 70000 CORBETT HILL VIEW CONDOMINIUM GENERAL COMMON ELEMENTS | WALSH & FORSTER INC 2905 SW 1ST AVE PORTLAND, OR 97201-4705 | SLAVIN RD LLC 1800 BLANKENSHIP RD #160 WEST LINN, OR 97068 | SARAH LINGLEY WSP USA INC 1300 SW 5TH AVENUE PORTLAND OR 97204 USA | KELSEY HINSPERGER WSP USA 1001 FOURTH AVE #3100 SEATTLE, WA 98154 | ||||
https://www.portlandmaps.com/detail/permit/4966806_did/ | 23-081921-000-00-LU | 10331 N OSWEGO AVE, 97203 | LDP - Land Division Review (Partition) | Type 1x procedure | Partition Off The Southerly 46 Ft | 0 | 09/08/2023 12:11 | Pending | 4966806 | 1N1W01AD 00300 OAK PARK ADD 2 BLOCK A NLY 125' OF ELY 1/2 OF LOT 3 EXC WLY 150' | PATTY GIROUX 11716 SE LEXINGTON ST PORTLAND, OR 97266-5936 | CHRIS FISCHBORN ZTEC ENGINEERS 3880 SE 8TH #280 PORTLAND OR 97202 | |||||
https://www.portlandmaps.com/detail/permit/4967893_did/ | 23-082966-000-00-LU | 615 NW 18TH AVE, 97209 | HR - Historic Resource Review | Type 1 procedure new | Repair/Maintain Two Existing Dormers Due To Rotten Members. The Proposed Work Affects Less Than 150 Sf Of Facade Or Roof Area. | 0 | 09/12/2023 14:04 | Pending | 4967893 | 1N1E33AC 07400 COUCHS ADD BLOCK 175 N 45' OF LOT 4 | ALEXANDRU IANOS 11433 SE WILLIAM OTTY RD HAPPY VALLEY, OR 97086 | ELSON NGUYEN HM GROUP LLC 3036 SE 131ST AVE PORTLAND OR 97236 | |||||
https://www.portlandmaps.com/detail/permit/4971103_did/ | 23-086035-000-00-LU | 1330 NE 102ND AVE, 97220 | AD - Adjustment | Type 2 procedure | Adjustments (To The Site) Requested, As Follows (And Please Note That A Replat Will Be Applied For In The Near Future): 1. Adjustment To Increase The Frontage Limit On The Proposed Western Development Site By 67.5 Linear Feet For A Total Of 57 Percent And Conditionally Limit The Proposed Eastern Development Site To A Maximum 255 Linear Feet ((645 X .50) ¿ 67.5) Of Frontage To Compensate For The Increase On The Proposed Western Property. Approval Will Allow The Existing Parking Infrastructure For Both Sites To Remain Which More Than Meet The Maximum 50% (33.266.130.C.3). 2. Adjustment Review To Allow The Existing Wheel Stops To Remain As Established And Within The 5 Ft Landscape Setback Upon Approval Of The Replat With The Condition That Compliance Of This Standard Must Be Met, On Both Eastern And Western Parcels, At The Time Of Future Development Of The Eastern Development Site, As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.D.3). 3. Adjustment Review To Allow The Existing Landscape Buffer Width To Remain As Established Upon Approval Of The Replat With The Condition That Compliance With This Standard Must Be Met On The Eastern Development Site At The Time Of Future Development As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.G.2.C). 4. Adjustment Review To Defer The Required Accessible Parking Space For The Proposed Eastern Development Site Upon Approval Of The Proposed Replat With The Condition That Compliance With This Standard Must Be Met On The Eastern Development Site At The Time Of Future Development As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.D & 33.266.130.F.3). | 0 | 09/21/2023 12:38 | Pending | 4971103 | 1N2E34BB 02600 POWERS ADD BLOCK 4 LOT 1-11 TL 2600 DEPT OF REVENUE | LUMEN TECHNOLOGIES INC 1025 ELDORADO BLVD BROOMFIELD, CO 80021-8254 | JAMES CRAMER OTAK INC 808 SW 3RD AVE, #800 PORTLAND, OR 97204 | |||||
https://www.portlandmaps.com/detail/permit/4971105_did/ | 23-086037-000-00-EA | 300 N RAMSAY WAY, 97227 | PC - PreApplication Conference | Phase 1 Bowl And Life Safety Project - North Stage Lot Stairs, Fencing, Generator Enclosure And Lot Reconfiguration And The West Berm Exterior Exit Stairs, Fencing, Landscaping And Gates (Construction 2024). Phase 2 Bowl And Life Safety Project ¿ Interior Construction And Generator Install (Construction 2025). Future Phase Full Build Out ¿ Future Work, Currently Not Funded, Could Include Additional Interior Enhancements And A New Sloped Loading Dock On The North Stage Lot (Construction Tbd). | 0 | 09/21/2023 12:38 | Application | 4971105 | 1N1E34AB 01200 MC MILLENS ADD BLOCK 7&8&10-12&16 TL 1200 | PORTLAND CITY OF 1120 SW 5TH AVE #1250 PORTLAND, OR 97204-1912 | LEE STERRETT PERKINS & WILL INC 1301 FIFTH AVE #2300 SEATTLE, WA 98101 | ||||||
https://www.portlandmaps.com/detail/permit/4966856_did/ | 23-081966-000-00-LU | 12333 SE LONG ST, 97236 | AD - Adjustment | Type 2 procedure | Conversion Of Existing Garage To An Adu And Separate Storage Area. Adjustment Requested To Parking Standard 33.266.120.C.2 To Reduce The Front Setback From 10' To 2.5" To Allow For Parking In The Driveway. | 0 | 09/08/2023 13:38 | Pending | 4966856 | 1S2E14BB 02205 NORTHWOODS NO 2 LOT 23 | CHRISTIAN A S IBARRA 12333 SE LONG ST PORTLAND, OR 97236 | STEPHANIE V G GARCIA 12333 SE LONG ST PORTLAND, OR 97236 | RAVEN PEARCE UNIVERSITY OF OREGON ARCHITECTURAL STUDENT VOLUNTEER 1206 UNIVERSITY OF OREGON EUGENE, OR 97403 | ||||
https://www.portlandmaps.com/detail/permit/4967640_did/ | 23-082720-000-00-LU | 5225 N CHANNEL AVE, 97217 | GW - Greenway | Type 2 procedure | The Project Involves Modernizing The Mooring Infrastructure At The Port Of Portland¿S Berth 315 For The Purpose Of Creating A Layberth Suitable For Mooring Two Usns Bob Hope Class Vehicle Cargo Ships Or The Equivalent. The New Facility Will Also Add Infrastructure To Allow Service Vehicle Access To And From The Vessel. Improvements Will Include Adding A New Pier Platform And Approach Trestle, Two New Breasting Dolphins And Associated Catwalks And Three New Upland Mooring Structures. The Project Will Also Include Deepening The Berth To -34 Feet Crd. | 0 | 09/11/2023 10:04 | Incomplete | 4967640 | 1N1E20 00105 PARTITION PLAT 2003-38 LOT 3 TL 105 | PORT OF PORTLAND PO BOX 3529 PORTLAND, OR 97208-3529 | BILL BURGSTINER PACIFIC LAYBERTHING SOUTH, LLC 5036 ORTEGA BLVD JACKSONVILLE, FL 32210 | |||||
https://www.portlandmaps.com/detail/permit/4965978_did/ | 23-081125-000-00-EA | 2156 N WILLIAMS AVE, 97227 | EA-Zoning & Inf. Bur.- w/mtg | The Albina Vision Trust Office Is A Proposed Improvement To An Existing Single Story Concrete Building At The Corner Of N Williams And Ne Thompson Street. The Building Was Previously A Part Of Albina Block 23 And Was Partitioned In 2021 During The Development Of The Multifamily Housing Building At 2140 N Williams Ave. The Property Is 7,100 Sf At The Northwest Corner Of The Block. It Is Zoned As Cm2 Commercial Mixed Use. Not A Contributing Resource. | 0 | 09/12/2023 16:50 | Pending - EA | 4965978 | 1N1E27DA 13203 LOT 2 | ALBINA VISION TRUST INC PO BOX 5124 PORTLAND, OR 97208-5124 | CHANDRA ROBINSON LEVER ARCHITECTURE PC 4713 N ALBINA AVE, 4TH FLOOR PORTLAND OR 97217 | KELSEY MCWILLIAMS LEVER ARCHITECTURE 4713 N ALBINA AVE, FOURTH FLOOR PORTLAND OR 97217 USA | |||||
https://www.portlandmaps.com/detail/permit/4969464_did/ | 23-084460-000-00-LU | 1330 NE 102ND AVE, 97220 | AD - Adjustment | Type 2 procedure | Adjustments (To The Site) Requested, As Follows (And Please Note That A Replat Will Be Applied For In The Near Future): 1. Adjustment To Increase The Frontage Limit On The Proposed Western Development Site By 67.5 Linear Feet For A Total Of 57 Percent And Conditionally Limit The Proposed Eastern Development Site To A Maximum 255 Linear Feet ((645 X .50) ¿ 67.5) Of Frontage To Compensate For The Increase On The Proposed Western Property. Approval Will Allow The Existing Parking Infrastructure For Both Sites To Remain Which More Than Meet The Maximum 50% (33.266.130.C.3). 2. Adjustment Review To Allow The Existing Wheel Stops To Remain As Established And Within The 5 Ft Landscape Setback Upon Approval Of The Replat With The Condition That Compliance Of This Standard Must Be Met, On Both Eastern And Western Parcels, At The Time Of Future Development Of The Eastern Development Site, As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.D.3). 3. Adjustment Review To Allow The Existing Landscape Buffer Width To Remain As Established Upon Approval Of The Replat With The Condition That Compliance With This Standard Must Be Met On The Eastern Development Site At The Time Of Future Development As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.G.2.C). 4. Adjustment Review To Defer The Required Accessible Parking Space For The Proposed Eastern Development Site Upon Approval Of The Proposed Replat With The Condition That Compliance With This Standard Must Be Met On The Eastern Development Site At The Time Of Future Development As A Condition Of Its Zoning Approval And Final Occupancy. Improvements Would Be Made During The Construction Phase As Part Of Overall Project Development (33.266.130.D & 33.266.130.F.3). | 0 | 09/15/2023 09:08 | Void/ Withdrawn | 4969464 | 1N2E34BB 02600 POWERS ADD BLOCK 4 LOT 1-11 TL 2600 DEPT OF REVENUE | LUMEN TECHNOLOGIES INC 1025 ELDORADO BLVD BROOMFIELD, CO 80021-8254 | CARLY HARRISON EDLEN & CO 151 SW FIRST AVE, STE 300 PORTLAND, OR 97204 | |||||
https://www.portlandmaps.com/detail/permit/4970596_did/ | 23-085550-000-00-EA | NE AIRPORT WAY, 97230 | EA-Zoning Only - no mtg | Add A Gazebo To The Site As Well As Restrooms | 0 | 09/20/2023 11:57 | Application | 4970596 | 1N2E24AD 01600 PARTITION PLAT 1998-20 LOT 1 | ELECTRICAL WORKERS LOCAL 48 BUILDING ASSN INC 15937 NE AIRPORT WAY PORTLAND, OR 97230 | MARSHALL MCGRADY ELECTRICAL WORKERS LOCAL 48 BUILDING ASSN INC 15937 NE AIRPORT WAY PORTLAND, OR 97230 | ||||||
https://www.portlandmaps.com/detail/permit/4969831_did/ | 23-084813-000-00-LU | 633 SW MAPLECREST CT, 97219 | LDP - Land Division Review (Partition) | Type 2x procedure | Two Parcel Land Division | 0 | 09/18/2023 15:59 | Pending | 4969831 | 1S1E28DA 00700 MAPLECREST LOT 7 | DENIS NEWMAN 633 SW MAPLECREST CT PORTLAND, OR 97219 | SUSAN NEWMAN 633 SW MAPLECREST CT PORTLAND, OR 97219 | DEBBIE CLEEK THE BOOKIN GROUP 1020 SW TAYLOR ST, #555 PORTLAND, OR 97205 | ||||
https://www.portlandmaps.com/detail/permit/4969858_did/ | 23-084840-000-00-LU | 7706 SE ELLIS ST, 97206 | LDP - Land Division Review (Partition) | Type 1x procedure | Land Division To Create Two Parcels | 0 | 09/18/2023 16:44 | Pending | 4969858 | 1S2E17DA 17600 CHICAGO BLOCK 4 W 1' OF LOT 11 LOT 12 | PETER G EST OF EKLOF 7706 SE ELLIS ST PORTLAND, OR 97206 | MARK KURETICH SNOWBERRY HOMES LLC 1800 BLANKENSHIP RD #160 WEST LINN, OR 97068 | |||||
https://www.portlandmaps.com/detail/permit/4968483_did/ | 23-083526-000-00-LU | 338 NW 5TH AVE, 97209 | HR - Historic Resource Review | Type 1 procedure new | The Applicant Is Requesting Historic Resource Review Approval For A Non-Illuminated 5.5 Sf Blade Sign On The Historic Minnesota Building. The Blade Sign Is Made Of Aluminum Panels And Push-Through Acrylic Lettering. The Attachment Bracket Will Locate Anchor Bolts At The Brick Façade Mortar Joints To Avoid Damage To The Historic Bricks. Because The Proposal Is For Signage In A Historic District Greater Than 3 Sf, Historic Resource Review Is Required. | 0 | 09/13/2023 16:35 | Pending | 4968483 | 1N1E34CA 03100 COUCHS ADD BLOCK 35 LOT 6&7 | MRA SERA LLC 333 NW 9TH AVE #1504 PORTLAND, OR 97209 | ALEX CARLSON SIGN WIZARDS 1111 SE GRAND AVE PORTLAND OR 97214 | |||||
https://www.portlandmaps.com/detail/permit/4964625_did/ | 23-079805-000-00-EA | 7884 SE 21ST AVE, 97202 | EA-Zoning Only - w/mtg | Zoning Rm1Dp In Johnson Creek Pd. Creek Is On The Site. Proposal Includes An Addition To The Existing Sfr That Includes A New Garage And Small Addition At Rear. There Is A Fourplex Behind The House On Lot. Is The Addition Allowed With 33.537.150.C? We Will Ensure That 50% Maximum Impervious Surface Is Met. | 0 | 09/01/2023 16:21 | Pending - EA | 4964625 | 1S1E23DA 02200 CRYSTAL SPR ADD LOT A EXC N 10' | JOHNS FAMILY TRUST PO BOX 80693 PORTLAND, OR 97280-1693 | LANA JOHNS PO BOX 80693 PORTLAND, OR 97280-1693 | KIMBERLY FREEMAN STRATA LAND USE PLANNING PO BOX 90833 PORTLAND, OR 97290 | |||||
https://www.portlandmaps.com/detail/permit/4966205_did/ | 23-021680-000-00-FP | N HAMLIN AVE, 97217 | FP_MHS - Middle Housing Subdivision | Approval Of A Preliminary Plan For A Middle Housing Land Division To Divide A Site With An Approved Fourplex Into Four Lots, As Illustrated With Exhibit C.1 And C.2, Subject To The Following Conditions: A. As-Built Survey. An As-Built Survey Shall Be Submitted With The Final Plat Survey For Life Safety, Bureau Of Environmental Services, And Water Bureau Review And Approval. That Plan Must Show That Structures And Services Are Constructed In Conformance With The Preliminary Plan And Meet Requirements In Relation To Property Lines And Any Easements Or Tracts. B. The Final Plat Must Show The Following: 1. The Final Plat Survey Shall Include A Note With The Following Statement: ¿This Plat Was Approved As A Middle Housing Land Division Under Ors 92.031.¿ 2. A Private Service And Access Easement, Providing Pedestrian And Fire Department Access, Use Of Required Common Area, Sanitary Sewer Service, Stormwater Service, And Water Service, For The Benefit Of Lots 2,3 And 4 Shall Be Shown And Labeled Over The Relevant Portions Of Lots 1 Through 4. 3. A Recording Block For The Legal Documents, Required By Condition C.1 Below. The Recording Block(S) Shall, At A Minimum, Include Language Substantially Similar To The Following Example: ¿A Maintenance Agreement Has Been Recorded As Document No. ___________, Multnomah County Deed Records.¿ C. The Following Must Occur Prior To Final Plat Approval: 1. A Maintenance Agreement Shall Be Executed For The Private Easements Described In Condition B.2 Above. The Agreement Shall Include Provisions Assigning Maintenance Responsibilities For The Easement Area And Any Shared Facilities Within That Area, Consistent With The Purpose Of The Easement, And All Applicable City Code Standards. The Access Easement Must Be Designated For Use By The Fire Department And As Common Area For Use By The Owners Of Lots 1-4. The Agreement Must Be Reviewed By The City Attorney And The Bureau Of Development Services, And Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. 2. An Easement And Maintenance Agreement For Shared Or Common Building Elements Shall Be Executed. The Agreement Must Be Reviewed By The Bureau Of Development Services, Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. | 0 | 09/07/2023 10:40 | Under Review | 4966205 | 1N1E09BC 05100 PENINSULAR ADD 2 BLOCK 13 LOT 25&26 | DEZ DEVELOPMENT LLC 10117 SE SUNNYSIDE RD #F PMB 1123 CLACKAMAS, OR 97015-6798 | SLAVIK DEZHNYUK DEZ DEVELOPMENT LLC 10117 SE SUNNYSIDE RD, STE F1123 CLACKAMAS OR 97015 | ||||||
https://www.portlandmaps.com/detail/permit/4964587_did/ | 23-079768-000-00-LU | 2248 NW HOYT ST, 97210 | HRM - Historic Resource Review w/Modifications | Type 2 procedure | The Applicant Requests Historic Resource Review Approval For The Addition Of A New Painted Black Steel Spiral Stairs And Balconies In The Rear Yard Of An Existing Contributing Resource In The Alphabet Historic District. The Existing First Floor Deck Will Remain, While The New Balcony And Stairs Will Connect The Ground Floor, 2Nd Floor, And Attic/ 3Rd Floor Levels Of The Existing Residence. Steel Balconies At 2Nd Floor And Attic/ 3Rd Floor Level Also To Be Added And Structurally Independent Of Residence. Wood Double French Doors Will Replace The Existing Double Hung Window At The Balcony On The 2Nd Level And A New Wood Single Door To Replace Existing Casement Window At The Attic/ 3Rd Floor Level. Both Doors And Associated Trim To Match Existing Door Style, Trim And Wood Material. Two Deck Options Have Been Provided For Review. Modification Request Through Historic Resource Review [33.846.060] 1. Setbacks [Pzc 33.120.220.B.1]: Reduce The West-Side Property Line Setback For The 2Nd Floor Deck From 5¿ To 3¿-4¿. 2. Setbacks [Pzc 33.120.220.B.1]: Reduce The East-Side Property Line Setback For The New Spiral Stair From 5¿ To 3¿-4¿. Because The Proposal Is For Alterations To An Existing Contributing Historic Residence In The Alphabet Historic District, Historic Resource Review Is Required. | 0 | 09/05/2023 15:24 | Pending | 4964587 | 1N1E33BD 17200 KINGS 2ND ADD BLOCK 17 W 1/2 OF LOT 10 | TIMOTHY TEES 2248 NW HOYT ST PORTLAND, OR 97210 | JARED DIGANCI WAECHTER ARCHITECTURE 4224 N MISSISSIPPI AVE, #201 PORTLAND, OR 97217 | |||||
https://www.portlandmaps.com/detail/permit/4966469_did/ | 23-081597-000-00-LU | 8823 SE MARKET ST, 97216 | LDP - Land Division Review (Partition) | Type 1x procedure | Divide An Approximately 6900-Sq Ft Parcel Into Two 3450-Sq Ft Parcels. The Future Home On The New Parcel Will Dispose Of Its Stormwater To A Lined Sand Filter (Sw-141). The Existing Home Will Continue To Dispose Of Water Using Its Existing Downspout System. | 0 | 09/07/2023 15:34 | Void/ Withdrawn | 4966469 | 1S2E04CA 14300 STANLEY & PLAT 2 BLOCK 9 LOT 19&20 | MARGARET CEJALVO 8823 SE MARKET ST PORTLAND, OR 97216-1825 | RONALD CEJALVO 8823 SE MARKET ST PORTLAND, OR 97216-1825 | BRANDON FOUSHEE 6341 S CLAIBORNE AVE GILBERT, AZ 85298 | TOM FOUSHEE 1110 W NEWPORT BEACH DR GILBERT AZ 85233 | |||
https://www.portlandmaps.com/detail/permit/4969159_did/ | 23-084163-000-00-EA | 2800 NE 82ND AVE, 97220 | EA-Zoning & Inf. Bur.- w/mtg | Develop The Site To House The Portland Audubon'S Wildlife Care Center. | 0 | 09/18/2023 12:32 | Pending - EA | 4969159 | 1N2E28BC 00400 SECTION 28 1N 2E TL 400 12.49 ACRES | SKIDMORE LP 16205 NW GILLIHAN RD PORTLAND, OR 97231 | KIM OLSON MAHLUM ARCHITECTS 1380 SE 9TH AVE PORTLAND OR 97214 USA | ||||||
https://www.portlandmaps.com/detail/permit/4966156_did/ | 23-081297-000-00-EA | 4841 NE M L KING BLVD, 97211 | EA-Zoning Only - w/mtg | The Proposed Project Encompasses Two Empty 5,000 Sf Mid-Block Lots On The West Side Of Mlk Blvd. Between Ne Wygant And Alberta St. The Proposal Places One New Building On The North Lot With Parking Lot, Trash Enclosure And Bike Parking On The South Lot. The Building Is Proposed To House Behavioral Health Services At The Ground And Second Levels. Administration And Other Supporting Functions Are Located At The Ground Level With The Second Level Containing 16 Beds (No Cap On Stay), Supporting Staff & Shared Bathrooms. Medication Will Be Administered By Staff. On The Third Level, Community-Based Structured Housing Is Proposed With 16 Beds (No Cap On Stay), 1 Staff Member & Shared Bathrooms. Medication Will Be Self-Administered And Meals Prepared In An Off-Site Kitchen Will Be Provided Onsite. | 0 | 09/08/2023 09:53 | Pending - EA | 4966156 | 1N1E22AD 00600 MAEGLY HIGHLAND BLOCK 5 LOT 8 | CONCORD NOPO LLC PO BOX 12269 PORTLAND, OR 97212 | GABE DOMINEK DECA ARCHITECTURE 935 SE ALDER PORTLAND OR 97214 USA | ||||||
https://www.portlandmaps.com/detail/permit/4966761_did/ | 23-081876-000-00-EA | 8314 N WILLAMETTE BLVD, 97203 | EA-Zoning & Inf. Bur.- w/mtg | Two (2) 19-Unit Multi-Family Apartment Buildings On (4) Existing Contiguous Tax Lots, On A Fairly Steep Overall Site Condition. Bldg A To Be 4 Levels, ~21,500 Gsf And Bldg B To Be 5 Levels, ~28,500 Gsf, With Common Area Amenities And A Shared Outdoor Entry Court. Anticipating On-Site Storm Water Management Facilities. | 0 | 09/08/2023 11:08 | Pending - EA | 4966761 | 1N1W12BD 02700 JAMES JOHNS 2ND ADD BLOCK 18 LOT 7&8 | DAVID PATTERSON 8308 N WILLAMETTE BLVD PORTLAND, OR 97203 | SCOTT THAYER OTAK ARCHITECTS 808 SW 3RD AVE., STE 800 PORTLAND, OR 97204 | ||||||
https://www.portlandmaps.com/detail/permit/4969635_did/ | 23-050558-000-00-FP | SE TOLMAN ST, 97206 | FP_MHS - Middle Housing Subdivision | Final Plat To Create 4 Lots | 0 | 09/18/2023 11:57 | Application | 4969635 | 1S2E17DD 16100 CHICAGO BLOCK 17 LOT 10 | DEZ DEVELOPMENT LLC 10117 SE SUNNYSIDE RD #F PMB 1123 CLACKAMAS, OR 97015-7708 | GARRETT SANDBERG DEZ DEVELOPMENT 15648 SE 114TH AVE, #211 CLACKAMAS, OR 97015 | ||||||
https://www.portlandmaps.com/detail/permit/4969190_did/ | 23-084194-000-00-EA | 6968 N MONTANA AVE, 97217 | EA-Zoning & Inf. Bur.- w/mtg | Considering Potential Development Of This Lot With A 19-Unit Multifamily Building. Before Proceeding With A Design, We Need To Determine Project Feasibility By Understanding Pbot Street/Alley Improvements And Any Row Dedications. Would Revise Design From 6956 N Montana To Meet Prescriptive Design Standards For Corner Lot Context. | 0 | 09/15/2023 13:22 | Application | 4969190 | 1N1E15BB 05700 GOOD MORNING ADD BLOCK 12 LOT 11&12 | APT LLC 3233 NW VALLEY ST CAMAS, WA 98607 | ADRIAN OLTEAN DBM CONSTRUCTION, LLC 2505 SE 11TH AVE., STE 108 PORTLAND, OR 97217 | PARISH BURNS DBM CONSTRUCTION LLC 2505 SE 11TH AVE, SUITE 108 PORTLAND, OR 97202 | |||||
https://www.portlandmaps.com/detail/permit/4965438_did/ | 23-080596-000-00-LU | 4003 SE 82ND AVE, 97266 | AD - Adjustment | Type 2 procedure | Demolish Two Existing Buildings And Create One New 2-Story Building With A Commercial Kitchen, Retail Space, And Event Space. Also Remodel An Existing Building By Removing Existing Windows And Adding New Windows And Window Openings, Install New Exterior Siding, And Mechanical, Electrical, And Lighting To Serve The Remodeled Spaces. Adjustment To Setback Standard (33.130.215.B And Table 130-2) Is Being Requested. | 0 | 09/05/2023 14:15 | Pending | 4965438 | 1S2E08DD 01300 LA DENE PK BLOCK 1 LOT 1 EXC PT IN ST LOT 2-4 | MEALS ON WHEELS PEOPLE INC 7710 SW 31ST AVE PORTLAND, OR 97219 | BRIAN HOEFT SCOTT EDWARDS ARCHITECTURE 2525 E BURNSIDE STREET PORTLAND OR 97214 | |||||
https://www.portlandmaps.com/detail/permit/4967746_did/ | 23-082821-000-00-EA | 1441 N HAYDEN IS DR, 97217 | EA-Zoning & Inf. Bur.- no mtg | Four Story Mixed Use Development On A Vacant Lot. Includes Ground Level Retail And Parking Garage, Second Level Outdoor Plaza, 50 Hotel Rooms On Levels 2-4, And A Restaurant On Level 4 With A Connected Rooftop Deck. | 0 | 09/12/2023 11:58 | Pending - EA | 4967746 | 2N1E34 00200 SECTION 34 2N 1E TL 200 0.76 ACRES | M & A SARIEDDINE JOINT TR 11351 SE TYLER RD HAPPY VALLEY, OR 97086 | TERRY AMUNDSON KOBLE CREATIVE ARCHITECTURE LLC 2117 NE OREGON ST. #301 PORTLAND OR 97232 USA | ||||||
https://www.portlandmaps.com/detail/permit/4966438_did/ | 23-081567-000-00-EA | 10123 SE MARKET ST, 97216 | EA-Zoning & Inf. Bur.- w/mtg | Adventist Health Emergency Generator Phase 2 | 0 | 09/08/2023 14:46 | Pending - EA | 4966438 | 1S2E04A 02300 EVERGLADE LOT 6&7 TL 2300 SPLIT MAP R159228 (R261601510) | PORTLAND ADVENTIST MEDICAL CENTER PO BOX 619135 ROSEVILLE, CA 95661 | JOSH KOLBERG PKA ARCHITECTS 6969 SW HAMPTON ST PORTLAND, OR 97223 | CRAIG FRIEDMAN PKA ARCHITECTS 6969 SW HAMPTON ST PORTLAND OR 97223 | |||||
https://www.portlandmaps.com/detail/permit/4968441_did/ | 23-083486-000-00-EA | 3606 NE M L KING BLVD, 97212 | DA - Design Advice Request | (44) Affordable Housing Units (All Studios Meeting 60% Ami) On Seven Floors Including A Small Retail Area On A 50'X90' Lot. Floor Area Approximately 22,436Sf, No Parking, Some Outdoor Common Area Including A Rooftop Patio And Green Roof. | 0 | 09/13/2023 15:07 | Pending - EA | 4968441 | 1N1E23CC 25700 LINCOLN PK BLOCK 22 LOT 4 EXC PT IN ST | ENT VENTURES IX LLC 225 SW 1ST AVE PORTLAND, OR 97204 | JOHN HOLMES GUNA COLLABORATIVE 3264 SW EVERGREEN TER PORTLAND, OR 97205 |