Metro: Commercial Land Use Review Intakes Report

Learn more about Bureau of Development Services permits. There are several types of permits reports available in the Building menu.

Sort, filter and search using any of the following:

<< >>

    PERMIT DETAILS CASE NUMBER ADDRESS WORK PROPOSED TYPE OF USE DESCRIPTION OF WORK VALUATION DATE RECEIVED DATE ISSUED STATUS IVR NUMBER PROPERTY LEGAL DESCRIPTION PERMIT INFO CONTRACTOR OWNER 1 OWNER 2 APPLICANT 1 APPLICANT 2 
    https://​www.portlandmaps.com/​detail/​permit/​5214844_​did/​ 25-097730-000-00-LU 111 NE KILLINGSWORTH ST, 97211 HRM - Historic Resource Review w/​Modifications Type 2 procedure Historic Resource Review, Type Ii (Code Section 33.846) With One Modification To The Base Zone 33.120.232 Street Facing Facades C. Windows. The Proposal Is For Four-Attached 2-Story Townhouse Units. Middle Housing Land Division Proposed To Divide Lot Into 4 Lots With One Townhouse Per Lot. Two Of The Units Will Be 2-Bedroom Units And The Other Two Units Will Be 3-Bedroom Units. Stormwater Will Be Managed By Two Drywells On Site. No Off-Street Parking. This Is A Non-Contributing Resource In The Peidmont Conservation District 0 12/​02/​2025 11:33 Pending 5214844 1N1E15DD 16900 PIEDMONT BLOCK 3 LOT 14 HABITAT FOR HUMANITY PORTLAND/​METRO EAST 1478 NE KILLINGSWORTH ST PORTLAND, OR 97211-4981 LEIGH ARMSTRONG HABITAT FOR HUMANITY PORTLAND REGION 1478 NE KILLINGSWORTH ST PORTLAND, OR 97211 BEATE LOANIDE-CULI R&B ARCHITECTURE STUDIO 3909 NE MLK JR BLVD., STE 204 PORTLAND, OR 97212
    https://​www.portlandmaps.com/​detail/​permit/​5213725_​did/​ 25-096667-000-00-EA NW BROADWAY, 97209 DA - Design Advice Request This Project Continues The North Park Blocks Onto The Three Partially Developed Blocks Situated North Of Nw Glisan Street And Within The 2019 Broadway Corridor Masterplan Development Area And Creates Green Loop Design Guidelines For The Green Loop Through The Broadway Corridor. The Three Blocks Are Divided Into Two Sites For This Project. Site 1, Block 112, Adjacent To Willamette University - Pacific Northwest College Of Art (Pnca), Is An Approximately 30,000 Square Foot Parcel Extending From Nw Glisan St. North To Nw Hoyt Street, East Of Nw Park Ave. Currently The Site Is Asphalt Paved And Is Leased To Pnca For Parking And Event Space. The Proposed Design Is Intended To Be Urban Plaza And Support The First Section Of Green Loop In The North Park Blocks. Site 1 Will Be Designed, Permitted, Bid, And Constructed As Part Of This Project. Site 2, The Broadway Corridor Park Parcels, Is A 2-Acre Site Spanning Two Full Blocks From Nw Hoyt To Nw Johnson Street. This Site Is Owned By Prosper Portland And Will Support The Future Development Of The Broadway Corridor Neighborhood And Green Loop. In Accordance With The 2019 Broadway Corridor Masterplan, Portland Parks & Recreation Will Develop A 30% Completeness Design And Engineering Package For The Park Parcel, Including A Two-Block Section Of The Green Loop Which Will Ascend 18-Feet Above Nw Johnson St At Parcel 2 Before Continuing North To The Broadway Bridge. An Additional Requirement Of This Project Is To Create A Design Guidelines Document For The Green Loop Through The North Park Blocks Extension And Broadway Corridor Including Design Goals, Materials Standards, Wayfinding And Signage, User Experience, And Operations And Maintenance. 0 12/​01/​2025 11:08 Pending - EA 5213725 1N1E34BC 07700 COUCHS ADD BLOCK 112&S TL 7700 PORTLAND CITY OF 1120 SW 5TH AVE #858 PORTLAND, OR 97204-1912 PORTLAND DEV COMM 222 NW 5TH AVE PORTLAND, OR 97209-4070 GARY DATKA PORTLAND PARKS & RECREATION 1120 SW 5TH AVE., #858 PORTLAND OR 97204
    https://​www.portlandmaps.com/​detail/​permit/​5214947_​did/​ 25-097831-000-00-EA 2815 N KILLINGSWORTH ST, 97217 EA-Zoning & Inf. Bur.- w/​mtg Due Diligence Study For Convenience Mart To Into 1 To 2 Shopping/​Retail Spaces, Possible Food Carts In Parking Lot. 0 12/​04/​2025 13:46 Application 5214947 1N1E16CD 13700 WILLAMETTE BLOCK 13 LOT 11&12 SOUTHLAND CORP LOCATION 14494 PO BOX 711 DALLAS, TX 75221-0711 TRAVIS HENRY HENRY POINT DEVELOPMENT 2584 SW MONTGOMERY DRIVE PORTLAND OR 97201
    https://​www.portlandmaps.com/​detail/​permit/​5214802_​did/​ 25-031616-000-00-FP 87 NE 78TH AVE, 97213 FP_​MHS - Middle Housing Subdivision Approval Of A Preliminary Plan For A Middle Housing Land Division To Divide A Site With An Approved Fourplex Development Into 4 Lots, As Illustrated With Exhibit C.1 ¿ C.2, Subject To The Following Conditions: A. As-Built Survey. An As-Built Survey Shall Be Submitted With The Final Plat Survey For Land Use Services, Life Safety, Fire Bureau, Environmental Services, And Water Review And Approval. That Plan Must Show That Structures And Underground Services Are Constructed In Conformance With The Preliminary Land Division Plan And Meet Requirements In Relation To Property Lines And Any Easements Or Tracts. B. The Final Plat Must Show The Following: 1. The Final Plat Survey Shall Include A Note With The Following Statement: ¿This Plat Was Approved As A Middle Housing Land Division Under Ors 92.031.¿ 2. One Or More Private Access, Emergency Access, Services And Utility Easements, Providing Pedestrian And Vehicle Access, Emergency Access And Egress, Sanitary Sewer Service, Stormwater Service, And Water Service, For The Benefit Of Lots 5-8 Shall Be Shown And Labeled Over The Relevant Portions Of Lots 5-8. At Minimum, Easement Area Must Be Added Over Lot 8 To Accommodate The Water Lines, Shared Sewer And Shared Drywell Proposed On That Lot. 3. The Easements Noted Above May Be Modified From What Is Shown On The Preliminary Plan By More Than The Allowances In 33.663.200.A, Provided The Change Is Approved By City Review Groups And All Access And Service Requirements Continue To Be Met. 4. A Recording Block For Each Of The Legal Documents, Required By Condition C.1 And C.2 Below. The Recording Block(S) Shall, At A Minimum, Include Language Substantially Similar To The Following Example: ¿A [Name Of Document] Has Been Recorded As Document No. ___________​, Multnomah County Deed Records.¿ C. The Following Must Occur Prior To Final Plat Approval: 1. An Easement And Maintenance Agreement For Shared Or Common Building Elements Shall Be Executed. The Agreement Must Be Reviewed By Portland Permitting & Development, And Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. Contact The Assigned Planner For A Standard Template When You Are Preparing Your Final Plat Application. 2. A Maintenance Agreement Shall Be Executed For The Easements Described In Condition B.2 Above. The Agreement Shall Include Provisions Assigning Maintenance Responsibilities For The Easement Area And Any Facilities Within That Area, Consistent With The Purpose Of The Easement, And All Applicable City Code Standards. The Agreement Must Be Reviewed By Portland Permitting & Development, And Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. Contact The Assigned Planner For A Standard Template When You Are Preparing Your Final Plat Application. 0 12/​04/​2025 10:07 Application 5214802 1N2E32DA 11101 BLOCK 19 LOT 12 78 EIGHTPLEX LLC 5933 NE FLANDERS ST PORTLAND, OR 97213-3739 KYRON CHRISTMAN FASTER PERMITS 2000 SW FIRST AVE SUITE 420 PORTLAND OR 97201 USA
    https://​www.portlandmaps.com/​detail/​permit/​5214775_​did/​ 25-031573-000-00-FP 95 NE 78TH AVE, 97213 FP_​MHS - Middle Housing Subdivision Approval Of A Preliminary Plan For A Middle Housing Land Division To Divide A Site With An Approved Fourplex Development Into 4 Lots, As Illustrated With Exhibit C.1 ¿ C.2, Subject To The Following Conditions: A. As-Built Survey. An As-Built Survey Shall Be Submitted With The Final Plat Survey For Land Use Services, Life Safety, Fire Bureau, Environmental Services, And Water Review And Approval. That Plan Must Show That Structures And Underground Services Are Constructed In Conformance With The Preliminary Land Division Plan And Meet Requirements In Relation To Property Lines And Any Easements Or Tracts. B. The Final Plat Must Show The Following: 1. The Final Plat Survey Shall Include A Note With The Following Statement: ¿This Plat Was Approved As A Middle Housing Land Division Under Ors 92.031.¿ 2. One Or More Private Access, Emergency Access, Services And Utility Easements, Providing Pedestrian And Vehicle Access, Emergency Access And Egress, Sanitary Sewer Service, Stormwater Service, And Water Service, For The Benefit Of Lots 1-4 Shall Be Shown And Labeled Over The Relevant Portions Of Lots 1-4. At Minimum, Easement Area Must Be Added Over Lot 1 To Accommodate The Water Lines, Shared Sewer And Shared Drywell Proposed On That Lot. 3. The Easements Noted Above May Be Modified From What Is Shown On The Preliminary Plan By More Than The Allowances In 33.663.200.A, Provided The Change Is Approved By City Review Groups And All Access And Service Requirements Continue To Be Met. 4. A Recording Block For Each Of The Legal Documents, Required By Condition C.1 And C.2 Below. The Recording Block(S) Shall, At A Minimum, Include Language Substantially Similar To The Following Example: ¿A [Name Of Document] Has Been Recorded As Document No. ___________​, Multnomah County Deed Records.¿ C. The Following Must Occur Prior To Final Plat Approval: 1. An Easement And Maintenance Agreement For Shared Or Common Building Elements Shall Be Executed. The Agreement Must Be Reviewed By Portland Permitting & Development, And Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. Contact The Assigned Planner For A Standard Template When You Are Preparing Your Final Plat Application. 2. A Maintenance Agreement Shall Be Executed For The Easements Described In Condition B.2 Above. The Agreement Shall Include Provisions Assigning Maintenance Responsibilities For The Easement Area And Any Facilities Within That Area, Consistent With The Purpose Of The Easement, And All Applicable City Code Standards. The Agreement Must Be Reviewed By Portland Permitting & Development, And Approved As To Form, Prior To Final Plat Approval. The Document Must Be Referenced On And Recorded With The Plat. Contact The Assigned Planner For A Standard Template When You Are Preparing Your Final Plat Application. 0 12/​04/​2025 09:12 Application 5214775 1N2E32DA 11100 MT TABOR VILLA BLOCK 19 LOT 11 78 EIGHTPLEX LLC 5933 NE FLANDERS ST PORTLAND, OR 97213-3739 KYRON CHRISTMAN FASTER PERMITS 2000 SW FIRST AVE SUITE 420 PORTLAND OR 97201 USA
    https://​www.portlandmaps.com/​detail/​permit/​5214157_​did/​ 25-097077-000-00-EA 6845 N CUTTER CIR, 97217 EA-Zoning & Inf. Bur.- w/​mtg Possible Purchase Of Property To Use As A Trucking Company 0 12/​02/​2025 13:13 Application 5214157 1N1E17A 00800 1951 COMMISSIONERS ADD BLOCK 7 LOT 1 GULSONS CUTTER LLC 210 SW MORRISON ST #600 PORTLAND, OR 97204-3150 MADRONA CUTTER LLC 210 SW MORRISON ST #600 PORTLAND, OR 97204-3150 STAN RICHARDS R+L CARRIERS 600 GILLAM RD WILMINGTON, OH 45177
    https://​www.portlandmaps.com/​detail/​permit/​5214983_​did/​ 25-097867-000-00-EA 1701 SE WATER AVE, 97214 PC - PreApplication Conference New Residential Project On The Omsi Master Plan Developed By Edlen & Co. And Hacienda Cdc. Estimated At 104 Units At A Maximum Height Of 85', This Building Will Be Affordable Housing Focused On Community Development With Exterior Programmed Space And And A Strong Desire To Reconnect The Public And Residents To Portland'S Waterfront. New Pedestrian Pathways, Extensive Landscaping And Innovative Systems On Display Are Some Of The Values In The Project. Storm Water Management Will Be Highly Considered In The Landscaping And Integral To The Project Design. It Will Be Functional For Protecting The Building And Designed To Highlight The Site'S Relationship To The Earth And Water. 0 12/​04/​2025 14:42 Application 5214983 1S1E03D 00100 SECTION 03 1S 1E TL 100 2.46 ACRES OREGON MUSEUM OF SCIENCE & INDUSTRY 1945 SE WATER AVE PORTLAND, OR 97214-3356 MARTY DANE HOLST ARCHITECTURE 123 NE 3RD AVE., STE 310 PORTLAND, OR 97232
    https://​www.portlandmaps.com/​detail/​permit/​5214534_​did/​ 25-097427-000-00-LU 1032 SE 12TH AVE, 97214 LDP - Land Division Review (Partition) Type 1x procedure Request For A 2-Lot Partition Of An Existing Cm2-Zoned Property Developed With Two Existing Buildings. No New Development Or Exterior Alterations Are Proposed. The Purpose Of The Partition Is To Create Two Legal Lots, Each Containing One Existing Structure, With All Existing Utility Services And Site Conditions Maintained. 0 12/​03/​2025 13:04 Pending 5214534 1S1E02BD 01500 BLOCK 256 LOT 4 HEIDI LAVERTY 5541 NW 164TH AVE PORTLAND, OR 97229 CONNOR LAVERTY 1032 SE 12TH AVE LLC PO BOX 14687 PORTLAND, OR 97293
    https://​www.portlandmaps.com/​detail/​permit/​5213785_​did/​ 25-046772-000-00-FP 6035 SE TENINO ST, 97206 FP_​MHS - Middle Housing Subdivision Final Plat For A 14-Lot Subdivision Through An Approved Middle Housing Land Division 0 12/​01/​2025 12:32 Application 5213785 1S2E19DD 00800 DARLINGTON BLOCK 20 LOT 11 TENINO ESTATES LLC 8241 SW 80TH AVE PORTLAND, OR 97223 VITALY SUKHANOV TENINO ESTATES LLC 8241 SW 80TH AVE PORTLAND, OR 97223
    https://​www.portlandmaps.com/​detail/​permit/​5214109_​did/​ 25-097032-000-00-EA 701 NE COLUMBIA BLVD, 97211 EA-Zoning & Inf. Bur.- w/​mtg Replat Of 5 Lots Into 2 Lots So That Each Building Is On Its Own Lot. 0 12/​02/​2025 12:06 Application 5214109 1N1E11CB 00400 SECTION 11 1N 1E TL 400 3.30 ACRES FEDERAL EXPRESS CORPORATION PO BOX 1450 COCKEYSVILLE, MD 21030 PORTLAND COLUMBIA INDUSTRIAL OWNER LLC 9525 W BRYN MAWR #700 ROSEMONT, IL 60018-5250 SPENCER MAYES BRIDGE INDUSTRIAL 10655 NE 4TH ST #212 BELLEVUE, WA 98004